TOTAL MARINE SERVICE REPAIR AND MANAGEMENT

LINKS   |   CONTACT

Stark Bros Marine Engineers
HOME  |   MARINE ENGINEERING |   DRY DOCKING |   BOAT BUILDING |   SPECIALIST FABRICATION |   TRANSPORT STORAGE |   FOR SALE |   NEWS
Stark Bros Marine 1px
Stark Bros Marine 1px
Stark Bros Marine 10px

 

 

 

 

Jaguar

 

 

 

 

 

 

 

 

 

 

 

 

 


 



 

 

 


 

Lyttelton Snow



 




Dock Pump House - earthquake









 

 

 

Eos -1

 

 

Nirvana -1

 

Nessie J - 312

 

 

 

                Frank Stark

 

 

 

 

 

 

 

Jubilee launch

 

 

 

Frontier launch

 

Stark Bros Marine 10px

Stark Bros News

____________________________________________________

Status Update - 27-1-2012.

The ship was dry docked evening of 26-1-2012.
The entire wheel house structure, the main engine, cargo mast and booms, hatch covers, and most equipment has been removed.
A 3m section of the bow was removed prior to docking along with some pre-cutting of the hull and deck plating.
Full cut up will now proceed until completed.


Link to photo update -

               MV Jaguar - Photo update of De-construction #3 - 4/2/2012

 

MV Jaguar - 63.76m Cargo Ship to be De-constructed.

Jaguar - dry dock      Jaguar - dry dock stern

In a very sad twist of events, the MV Jaguar is now almost certainly set to be deconstructed by Stark Bros Ltd - starting October 2011.

Last dry docked by Stark Bros for repairs in August 2010, the owner was subsequently placed in Receivership by their financiers.
The vessel condition arguably proved contrary to previous recent survey status, and resulted in difficulties in selling the vessel by the Receivers, thus deconstruction now looms as the most likely option.

Expressions of Interest are currently being sought from parties who are interested in purchasing any parts or components from this vessel.

Please refer to our For Sale section, the lefthand Red Tab marked
" Vessel De-Construction" for further details.

      Link to "Vessel De-Construction" section.

 



Lyttelton - Blanketed with Snow 15-8-2011

For the 2nd time this year, Lyttelton awoke to significant snowfall on the ground, causing disruption to the workforce, with closed roads and in some cases snow just too deep to safely move about, unless you had a big 4wd.

Some fun was had with kids, many snowmen were built, makeshift tobogans and sleds wherever a slope was near.

No major damage was caused, but the "wow" factor has quickly disappeared due to the additional time off with staff unable to get to work, and resulting delays to work schedules.

 

 






 

Earthquake 6.3mag - 13/6/2011

Lyttelton and Christchurch have experienced another earthquake, again we are fully operational.


Earthquake 6.3mag - 22/2/2011

Lyttelton and Christchurch experienced a horric earthquake on the 22-2-2011 at 12.51 hours. 

The power and destruction was terrifying and incredible.

181 people lost their lives, and many buidlings have been and will need to be demolished.

Stark Bros Ltd while sustaining building damage is fully operational, no staff were killed or injured, although many have lost homes or have significant damage.
T
he Dry Dock itself has sustained no significant or terminal structural damage, the pump house building has been dismantled, but the Dry Dock faciltiy is and remains very much Open for Business.


 


S/Y Eos  - 93m Superyacht Dry Docking.

March 2010 saw the Worlds Largest Private Sailing Super Yacht dry docked with Stark Bros Ltd in Lyttelton.

      Adobe PDF Icon   Media Release

            Eos - dry dock    Eos afloat

 


 

 

S/Y Nirvana - 53.5m Superyacht Dry Docking.

February 2010 saw the 1st Super Yacht dry docked in Lyttelton, with the arrival and successful completion of works by Stark Bros on the S/Y Nirvana.


   Adobe PDF Icon    Media Release
 

            Nirvana - 2          Nirvana - 4

  

 

F.V. NESSIE  J  - 13m Timber Fishing Trawler

Officially Launched 20/3/2009.



Nessie J - 006a  Stark Bros Marine 10px FV NESSIE  J
13m Timber Fishing Trawler
Stark Bros Marine 10px

Adobe PDF Icon FV Specifications
Adobe PDF Icon FV Launch day Images
Adobe PDF Icon Press Release March 09
Adobe PDF Icon

Photo drafts - email andrew@starkbros.co.nz for high res files to be sent to you, each file is approx 5MB.





FRANK STARK     - 27/1/1938 - 21/5/2008

After a relatively brief illness Frank Stark passed away peacefully at home on the morning of 21/5/2008 .

As many of you will know Frank received an advanced Gall Bladder Cancer diagnosis on the 14th February 2008
Frank and his family have a strong Christian faith, and know now that Frank is at home in Heaven, free from illness.

Frank started Stark Bros in 1958, and with the involvement of his Brothers and 3 Sons, Work and Family became almost inextricably linked and intertwined, often time at work being with family or enabling other family to be at home.

He was proud of his staff, he enjoyed seeing staff achieve and better themselves, with many apprentices and young people working for Stark Bros over the years.

While Frank was a man of relatively few words, and often preferred to reflect on others achievements rather than his own, we are all very proud of him.
His constant presence and wisdom at work will be greatly missed by all here at Stark Bros.

This is obviously an emotional time for us as a family company, especially in our 50th Jubilee year, but we will continue, and thank you for your support at this time.



F.V. JUBILEE - 16m Fishing Trawler

Officially Launched 30/1/2008.



Jubilee Launch (40) Stark Bros Marine 10px FV JUBILEE
16m Steel Fishing Trawler
Stark Bros Marine 10px

Adobe PDF Icon FV Specifications
Adobe PDF Icon FV Slipway Transportion
Adobe PDF Icon FV Launch day Images
Adobe PDF Icon Press Release DEC 07
Adobe PDF Icon Press Release JAN 07
Adobe PDF Icon

Photo drafts - email andrew@starkbros.co.nz for high res files to be sent to you, each file is approx 5MB.





 

F.V. FRONTIER - 19m Fishing Trawler

Launch Date : 10/8/2004.



FV Frontier Boat Building Stark Bros Marine 10px FV FRONTIER
19m Steel Fishing Trawler
Stark Bros Marine 10px

Adobe PDF Icon FV Specifications
Adobe PDF Icon FV Slipway Transportion
Adobe PDF Icon FV Launch day Images
Adobe PDF Icon FV Press Release MAY 04
Adobe PDF Icon FV Press Release APR 04
Adobe PDF Icon FV Press Release SEP 04




Stark Bros Marine 10px

 

 

 

Stark Bros Marine 1px
Stark Bros Marine 1px
HOME  |   MARINE ENGINEERING |   DRY DOCKING |   BOAT BUILDING |   SPECIALIST FABRICATION |   TRANSPORT STORAGE |   FOR SALE |   NEWS

Stark Bros Marine 10px

All materials Copyright Stark Bros 2005
Website by Red Kollective Ltd