Stark Brothers deconstructed the MV Jaguar, a 64m cargo ship of GRT 1044 tonnes. It is believed to be the first major vessel to be scrapped in a dry dock in New Zealand.

A 3m section of the bow and deck plating were removed prior to the ship being dry docked on 26 January 2012. The entire wheel house structure, the main engine, cargo mast and booms, hatch covers and most equipment were removed before full cut-up.

The final block was lifted from the dock at 1200 hours on 10 February 2012. While this was not a project of choice for Stark Bros, given the circumstances (a decision made by the receivers) that lead to the scrapping, it was an interesting and challenging project.

Date

May 14 2015

Tags

Dry Docking

Who We Are

Family owned and operated marine specialists serving the marine industry from the Port of Lyttelton since 1958.

Our Location

Office: 46 Norwich Quay, Lyttelton 8282

Postal: PO Box 144, Lyttelton 8841

Deliveries: Stark Bros Transport Depot - Charlotte Jane Quay, Naval Point, Lyttelton 8082

Email: info@starkbros.co.nz

Links of Interest

Quick Links